Track supplied items room by room

Rental Property Inventory Checklist

A clear property inventory identifies what is supplied, where it belongs, how many there are, and what condition was observed. Use a consistent item list and connect photos to specific entries.

What to record for each item

  • Room or location: identify where the item was observed, including storage or shared areas if in scope.
  • Item name: use a specific, consistent name such as “Dining chair” or “Microwave.” Add a make or model when it helps identify the item.
  • Quantity: count items individually where practical, and explain grouped counts or sets.
  • Condition: describe visible condition and distinguish what was observed from what was tested.
  • Notes: record identifying details, missing parts, existing marks, or anything not inspected.
  • Photo reference: connect the entry to a room/item photo or a clearly captioned image.

Download the free inventory template

Download the inventory CSV template

The CSV opens in common spreadsheet applications. Add a row for each item or a clearly described group, keep the original file, and use consistent condition wording throughout the inventory.

Build the inventory during a room-by-room walk-through

  1. Start with the same room order as your inspection checklist.
  2. List supplied furniture, appliances, fixtures, and access items such as keys, fobs, and remotes.
  3. Record quantity and condition separately; a quantity does not describe condition.
  4. Add a room and item caption to photos so they can be found from the inventory row.
  5. Flag items that were inaccessible, missing, or not tested instead of filling gaps with assumptions.

Using the inspection workspace

In the inspection workspace, you can rename checklist items, record a quantity, select a condition, add notes, and attach photos. Browser records are stored on your device, so export a JSON backup if you want to preserve the workspace data and its photos.

Pair your inventory with the move-in checklist and revisit it with the move-out checklist.